Day 50 Weather stayed cooler today, thank goodness. We managed to patch a few holes in the floor where the rust ate through and lay the sub - floor down for our bedroom. We ran out of the heavy duty glue and we're going to need to replace all the foam underneath the bus we chipped away to weld the floor safely. Not sure what kind of foam to get. We had to order the rivets, so we can't put the ceiling panels back up until Monday and I'll be at work. As much as I'm loving the cooler weather I know winter is coming and times will be even harder. We need electrical wiring, outlets, and plumbing soon. We wanted to have them running all along one side of the bus. We can only build the walls up so much without it. This is where some help would really be appreciated. We have just enough wood to close in the bedroom and maybe build some of the bed frame. We're keeping our chin up and doing everything we can with every bit we have.