More Sub-Floor/Insulation
Day 54
I'm at work.
Dave hits up Wal-Mart to price electrical wiring and to get more adhesive and caulk. We're needing the 50ft. The 25ft won't reach everywhere we need it to.
He started insulating the bedroom walls with a double layer of the recycled denim insulation we ordered from HOME DEPOT. We're running out of it and we'll be needing to order more when we can. (48''x 75ft) It went a long ways but the end of the roll is near. Such awesome progress to see. I'm so grateful for the cooler weather and better fortunes that has come our way. We just don't know when it's going to rain thought . . .
Dave glued the sub-floor down between the wheel wells. This is where our bedroom ends. We'll have a him and her closet(s) over the wheel wells before the bathroom starts. The sub - floor is all tacked down. We'll give that a day or two to dry and cure a bit before walking on it.